# Calibration and Evidence-Locking Policy This document defines when a numerical setting may move from development to a locked experiment. Calibration output is engineering evidence, not a paper result. ## Evidence states Every setting or implementation contract receives one of four states: 1. **Verified contract**: a deterministic identity or accounting invariant has passed an independent reconstruction from stored arrays. 2. **Provisional numerical setting**: calibration supports using the setting in another calibration or pilot, but not in a locked experiment. 3. **Frozen setting**: the value, selection rule, analysis configuration, source commit, and admissible operating envelope are fixed before locked data are inspected. 4. **Not freeze-ready**: the calibration design is confounded, lacks the required comparison, or has an unacceptable safety/transparency trade-off. ## Freeze gate A setting can be frozen only if all of the following are true: - trials are generated from a clean, immutable Git commit; - paired methods receive identical trajectory, model, sensor, and network inputs where the hypothesis requires pairing; - calibration instances are genuinely distinct rather than timing-only repetitions; - failure, invalidity, timeout, clipping, intervention, and exclusion reasons are machine-readable and retained; - the primary endpoint is numerically well-defined for the selected stratum; - the selected value is supported by a parameter scan or an external physical calibration, not by a single untested level; - tail behavior and failed trials are reviewed before the value is selected; - the locked configuration and independent metric configuration receive new hashes after the decision. ## H1--H4 decision boundaries - **H1**: freeze only after reach clipping, joint-limit stress, low-manipulability stress, and valid branch-continuity trajectories are separately identifiable. The experimental unit is a complete trajectory. - **H2**: numerical calibration may select a robust DLS region, but physical wrench-accuracy claims require an independent six-axis F/T reference, timestamp calibration, payload/friction calibration, and a causal acceleration estimate. - **H3**: the fixed-branch virtual-work identity is a deterministic contract. Actual closed-loop power mismatch is a different performance endpoint and must not be replaced by the identity check. Near-zero-power trials require a preregistered normalizer gate or an absolute mismatch outcome. - **H4**: passing the energy-accounting audit verifies implementation correctness only. Energy capacity and feedback gain remain not freeze-ready if the projection distortion is excessive or the tested network/contact envelope is incomplete. ## Data handling Raw batches remain under `output/experiments/` and are intentionally ignored by Git because they can be regenerated from the plan, source commit, and recorded seeds. The source-controlled audit records plan hashes, source-data hashes, anomalies, and freeze decisions. No calibration value may be copied into the manuscript Results section. Locked experiments must use a new batch directory and must never overwrite a calibration batch. A locked run is invalid if the worktree is dirty or if its recorded source and model hashes do not match the approved lock record.